SCREENZENO PARKING · PILOT ENQUIRIES

Your parking questions, answered.

Practical answers before you plan a car park availability sign project. ScreenZeno Parking is at pilot stage, with requirements confirmed for each site.

Pilot-stage product. Site suitability, counting-system connections and sign behaviour are confirmed per installation.

What is ScreenZeno Parking?

ScreenZeno Parking is a pilot-stage product for car park availability signs. It brings space counts, capacities, closures and manager controls together so drivers can see spaces available, FULL or CLOSED. The scope is agreed for each site.

Can it work with our existing counting system?

That is the intended approach. We assess the car park management system or camera-counting service your site already uses. Each connection must be confirmed for the specific installation before a rollout is agreed.

Can we keep our existing signs?

Possibly. Send the makes and models of your own LED screens and any existing equipment, or tell us that new signs are needed. Reuse is subject to a site assessment; it is not promised from a photograph alone.

Can one sign show several car parks?

The proposed layouts can show separate car park names, direction arrows and availability on one sign. A single car park can also have a dedicated sign. The layout and readability are checked for your site during the pilot.

What is the difference between FULL and CLOSED?

FULL tells drivers that no spaces are being offered at that time. CLOSED tells them that the car park is unavailable, even if spaces remain. The rules and wording for each are agreed with the operator.

Can we account for spaces taken out of use?

Capacity settings are included in the pilot dashboard. Agree which spaces are available to drivers, including reserved areas and temporary restrictions, then check the displayed result against those rules.

Can managers schedule closures and have limited access?

The pilot dashboard includes closure calendars and manager permissions. Assigned managers can view their car parks and manage closure dates. The scope of access and the activity record are checked with your team during the pilot.

What will drivers see if the count is out of date?

The wording and when it takes over are agreed and tested per site. Do not assume that an old number remains suitable. A message such as Availability unavailable can be considered without suggesting that the car park is full or closed.

Is Parking available as a proven, ready-made rollout?

We are taking pilot enquiries. Counting-system suitability, sign layouts, site rules and behaviour when information is unavailable must be confirmed for each installation. Wider rollout follows an agreed assessment and testing plan.

How is a parking project quoted?

Parking is quoted per project. Send your site location, car park capacities, counting-system details, existing sign details and target date. The quotation sets out the agreed scope, testing and responsibilities.